Rialto Towers Melbourne
Address:
525 Collins Street, Melbourne
Description:
Our works in the Rialto go back 6 years we have completed over 30-floor strip outs now of both towers, we have removed mechanically including with asbestos mastics, completed floor works, base building works like the 5 void cutouts on the roof for new air conditioning, a project that required unique access solutions as it was all done over the mechanical rooms. We thank Cameron at Capital Commercial and the team at Rialto for their ongoing support.
Projects:
Rialto Loading Dock Gate & Cage
Ground Floor KSR Bar Floor Demo Plaza
Level A & C
Level 1 & Level 1 Plantroom & Amenities Block walls
Level 2 Services Leak Clean Up
Level M2 Rialto Block Wall Removal & Level M2 & M2 Mastic Removal
Level 3, 6 & 7 Block Removal NT & Level 3 NT Screed, Risers St, 6 & 7
Level 6 North & South
Level 7 & Level 7 Window Screeds & Level 8
Level 12 & Level 12 Screed Removal & Duct Removal
Level 13, Level 14, Level 15 Base Building
Level 24, Level 25, Level 26 & Level 27 Grollo Tenancy
Level 28 & 29 Screed Removal
Level 28, Level 29, Level 30 Furniture & Demo
Level 31 Amenities Grind
Level 32 White & Case
Level 35 & 35S
Level 36 & Level 36 Window bays &Toilet Risers & Ductwork Mastic
Level 40 & Level 40 South Concrete Stair Infill
Level 42 Tenancy 4 & Level 42 Base Build
Level 43 Tenancy 2 & Common Area
Level 44 & 16N Ducts
Level 45 Tenancy 2 & Refurb
Level 46, Level 47, Level 48, Level 49
Level 50 Rialto Window Bay Screeds & Tenancy 3
Level 51 Asbestos Mastic Removal
Vue De Monde Storage Room Rialto
BMU Asbestos & Female EOT Refresh